I've created a comprehensive Engineering Variables Request Document for the JR Muller Unit 14 stormwater pipe project. The document is available at: **https://ugygslvc.gensparkspace.com/**

Key Findings and Analysis

Available Information from JR Muller Document:

Applied Design Principles from Inkulu Document:

Critical Information Gaps Identified:

🔴 HIGH PRIORITY GAPS:

  1. Geotechnical Data
  2. Soil classification and bearing capacity
  3. Groundwater levels and seasonal variations
  4. Native soil modulus (Inkulu used 7 MPa as reference)
  5. Hydraulic Design Parameters